涩涩视频,亚洲熟nu一区乱色,激情黄色视频免费观看,暴X七区二区

  
Product display Product

Product display

PVB Film (High-end)

Product introduction

Basic requirements and thickness of the glass of thestress glass and PVB thickness.

1 When the laminated glass is broken, the glass is thicker.,the greater the tension of the PVB film, the somust according to the PVB used, the glass thickness of the appropriate thickness of the degumming phenomenon, and the rational use of PVB can reduce the glass rebound of the bubble. For PVB film boards and other special use can be customized.

The thickness of the  glass and PVBfilm:

1) Applicable to 0.38mm PVB film (3 + 3), (5 + 5), (6 + 6) ordinary float glass.

2) 0.76mm PVB film is suitable for (6 + 6) double tempered glass and float glass below (8 + 8).

3) 1.14mm PVBfilm is suitable for (8 + 8) double tempered glass and float glass (10 +10).

4) 1.52mm PVB film is  suitable for (10 +10) double tempered glass and float glass (12 +12).

5) 1.90mm PVB film is  suitable for  (12 +12) double tempered glass and float glass (15 +15).

6) If  a laminated glass, use at least 0.76mm PVB film for hot bending process .

Third, autoclave molding: autoclave operating temperature, pressure, time in the curve shown in the figure.

Heating, cooling, autoclave pressure, pressure is usually equipped with automatic procedures without adjusting. If there is no automatic control manual, from the door of a closed autoclave, first open the filling, heating switch, when the temperature reaches 70 ° C is 0.6MPa, before heating the switch pressure switch, then turn on the heating switch until the insulation, The temperature and pressure required for packaging are 0.6 MPa, the general temperature is 135 ° C, the pressure is 1.3 mpa, and the time is 45-60 minutes. This can improve the stability and weather resistance of the laminated glass. When keeping warm, the dwell time begins to cool down and the temperature between 135 ° C and 70 ° C is not too fast. Take measures to keep the pressure in the kettle air during this period without falling for at least 50 minutes. Better put 50% of the reactor cooling water, all open cooling waterat 70 °C. After the temperature of the kettle drops to 40 ° C, the pressure discharge time canslow is not relieved because of the rapid relief of quality problems.

Fourth, PVB film storage.

1, Good packaging products can be stored at room for 24 months, avoid direct sunlight, rain, water and corrosive gases.

2, Aluminum foil packaging is damaged or has been opened, must be placed in the storage room or meet space storage requirements, no more than 60 days, should be placed on the ground more than 300 mm.

3, Laminating room storage need to maintain constant temperature,temperature of 18-22 ° C, humidity of 25% -40%, air quality above 300,000.

4, The floor  of laminating room and storage room need to use wooden floor with a better heat preservation and  moisture resistance, if customers with limited conditions can also use the floor paint to prevent groundwater which can cause excessive humidity.

PVB圖片.jpg

客服系統(tǒng) 国产精品.色呦呦| 你懂的 在线视频| 无码人妻精品一区二区蜜桃网站| 在线播放无码后入内射少妇| 欧美性色欧美a在线视频| 久久亚洲AV成人无码国产最大| 91精品久久久久久蜜桃| 欧美日韩天堂一区综合| 亚洲中文字幕色在线色| 久久鬼色| 亚洲天堂首页| 日本黄色网站99| 日本一区二区在线不卡| 成人精品视频| 色亚洲婷婷| 国产精品77| 玖在线观看无码| 在线观看污视频网站| 日韩欧美人乱伦懂色| 国产精品-区三区| 久久久久亚洲国产AV麻豆| 人人柔人人操| av无码天堂一区二区三区| 无码港日韩| 三区日韩| 色婷婷网| 欧美色一色| 无码国产片一区二区三区| 网站大全黄av| 亚洲蜜桃精久久久久久久| 日本高清综合视频| 国内少妇情人精品av| 欧美爱在线| 美少妇加比乐一区| www日本黄色视频| 国产高清xxx在线| sm在线免费观看| 精品熟女亚洲AV| 麻花传媒MV国产免费观看视频 | 免费毛片在线观看无码| 一区二区三区欧美精品|